<< Click to Display Table of Contents >> You are here: Greenlight Compliance Manager™ > Company Level > Configuration > Configuring Options > Required Signed POs |
Greenlight CM™ allows you to track if contracts must be returned by vendors and subcontractors.
1.From the ribbon toolbar, click Greenlight.
2.Click Greenlight, .
The main screen displays with the Dashboard tab active:
3.Click the Configuration tab.
The following screen displays:
Important: You can re-size your grid row height to display all the text in the row. Click in any row and use your mouse to drag the grid line up or down. This includes the header row.
4.In the Options grid, locate the Require Signed POs check box.
5.Click the check box to enter a checkmark and turn on the requirement.