<< Click to Display Table of Contents >> You are here: Greenlight Compliance Manager™ > Vendor/Subcontractor Level > Lien Waiver Config > Screen Layout |
Once the job is configured for lien release tracking, configure the vendor/subcontractor. The vendor Lien Waiver Config tab is where to input data and information about the vendor for use on lien waiver forms and reports.
1.From the ribbon toolbar, click Greenlight.
2.Click Greenlight, .
The main screen displays with the Dashboard tab active:
3.Click the Lien Waiver Config tab.
The following screen displays:
Field |
Description |
Track Waivers |
Users can set lien waiver tracking for vendors for each job. Click here for details. |
Follow Up Date |
Follow Up Dates allows users to organize which vendors are contacted. Click here for details. |
Notice Filed On |
This is the date that a pre-lien notice was filed. The Notice Filed On date can be used with the Job Notice Effective Date to help you quickly determine which date to use and when to start the lien waiver process. |
Notice Amount |
This is the pre-lien amount. Enter the amount of the notice in this field. |
Work Desc |
If the lien waiver form requires it, enter the work the subcontractor will be performing in this field. This field can be used to pre-fill lien waiver forms. |
Constructive Notice |
If you are in possession of a constructive notice, click this checkbox. |
Joint Check Required |
If the check should be made to a two companies, for example the general contractor and the subcontractor, select this checkbox. |
Disputed Claim for Extras |
If a vendor or subcontractor has extra claims, enter the amount in this field. This will used on the lien waiver forms. |
Default Waiver Forms from Job |
These are the previously identified default forms that will print once a lien waiver is generated. |
Form Type |
The Form Type column lists lien waiver types: Conditional Progress, Unconditional Progress, Conditional Final, Unconditional Final. Click any that apply to this job. |
Default Forms |
The Default Forms column lists the applicable state forms based on the physical job location. Use the field dropdown to select the correct default form. |
Commitment Summary |
Greenlight CM™ keeps track of a vendor's commitment summary from your accounting system along with how much unconditional progress amounts have been generated through Greenlight CM™. Note: This information is used on lien waiver forms and reports. Click here for steps. |
Default Automatic Waivers from Job |
If you want the system to automatically generate Conditional Progress or Unconditional Progress each month, click this check box. |
Generate Automatic Waivers |
Click this checkbox if you have the job record unchecked but want a specific vendor to receive automated waivers. |